Page 19 - External Jan 2017
P. 19

K&A was commissioned by Al Khayyat Contracting Company (KCD) under D&B
contract with the Private Engineering Office to undertake the detailed design for the
infrastructure works of Lekhwiya Sports Stadium. K&A consultancy services covered
the detailed design of roads, parking, landscaping, wet and dry utilities, service
tunnels, pumping stations, reservoirs and package wastewater treatment plant.

The first phase of the massive project included a main stadium with a capacity of 10,000 spectators
and four training fields with two changing rooms. The second phase featured a mosque, a sewage
treatment plant, a technical services building and a services tunnel.

Lekhwiya main stadium boasts five electronic entrance gates for spectators along with 27 automatic
exit gates to ensure easy stadium access, while the main club entrance gate is exclusively for VIPs,
players, media, team managers, referees, and games monitors. The stadium even guarantees that
spectators with special needs have everything they need from specially allocated seating to entrances/
exits, transportation, and more.

The stadium is lit by four       Well-being is taken into          closed, fully equipped air-
lighting towers that showcase    consideration with sauna and      conditioned cabins, as well
the latest architecture system   Jacuzzi rooms for players plus    as open air booths, and a
including a high illumination    a clinic with medical rooms,      private office) add distinctive
intensity of 3,500 lux to        proper medical services and       touches. The stadium also
provide maximum lighting         the latest medical equipment      features an advanced audio
while broadcasting the           for athletes and spectators       system and internal display
matches on television using up-  in case during the event, an      screens. Services and utilities
to-date technology and a high    accident or injury occurs.        are located in an underground
degree of clarity. The stadium   Media coverage is facilitated     tunnel for easy follow-up,
includes four changing rooms     with a fully equipped             operation and maintenance.
for the players so that if two   dedicated cabin for the press, a  A covered multicolor parking,
games are organized on the       hall for press conferences and    an open air parking, an indoor
same day, all clubs can have     a completely equipped private     gymnasium, a fitness block, a
their very own rooms. There      press lounge.                     guest house, a banquet hall for
are also separate rooms for      In addition, six commentator      2,000 people, walkways, and
coaches and technical staff, as  cabins, two match analysis        gardens all come together to
well as rooms for referees and   studios, administrative offices   create an inviting sports city
technical observers, equipped    for the stadium’s staff, and      that can cater to the needs of
with all the services and        a dedicated floor for VIP         the future.
amenities. Even physiotherapy    visitors and dignitaries (with
rooms are available.

                                                                   page 19
   14   15   16   17   18   19   20   21   22   23   24