Page 22 - K&A External Newsletter_January2018
P. 22

MARKET
         FOCUS



         Cairo                                                                           Cairo









                                                                                            Line





                                                                                                    th
         DID YOU KNOW?                                                                        10  of
         10  of Ramadan is a
           th
         city located on the
         Cairo-Ismailia desert
         highway, 46 km from                                                       Ramadan
         Cairo. It is the largest
         industrial city in the
         Middle East with 1,625                                             (Cairo LRT)
         factories and 153,000
         workers.






                  COUNTRY                   CLIENT
                  Egypt                     The National Authority
                                            for Tunnels (NAT)



                  FEATURES
                  The 67 km long Cairo LRT is expected to
                  transport 340,000 passengers per day.





                     A fast commuter railway
                     connecting Cairo, 10  of
                                            th
                     Ramadan City and the New
                     Administrative Capital
                     The National Authority for
                     Tunnels (NAT), the client
                     and owner of Cairo Metro &
                     Commuter Railways, awarded
                     on 28 August 2017, Khatib &
                     Alami (K&A) as the lead of a
                     joint venture with TPF Getinsa
                     Euroestudios, the design review
                     and the construction supervision
                     of the 10  of Ramadan Railway.
                              th
                     The first phase of the electrified
                     train will be 67.00 km (58.7 km at
                     grade, 4.2 km elevated via three
                     bridges, and 4.1 km underground
                     via four tunnels).










          page 22
   17   18   19   20   21   22   23   24   25   26   27